스킵네비게이션

Total Search KOR
Business Business

Incheon North Port Pier

We provide domestic and overseas scrap metal necessary for Dongkuk Steel to produce steel products by stevedoring and transporting. We also offer all levels of logistics services including support for in-company logistics needed in the pre/post production process and for external equipment.

  • AddressIn Dongkuk Steel, 15, Jungbongdae-ro, Dong-gu, Incheon
  • Contact Number+82-32-830-6960

Strengths

Know-how of performing a steel corporation’s specialized logistics

We provided stable logistics services including stevedoring service and transporting raw materials for the steel products of Dongkuk Steel.

Scrap stevedoring specialized know-how available

We’ve reached the annual stevedoring capacity of one million tons for two consecutive years.

Eco-friendly stevedoring to reduce the scattering of dust

Eco-friendly stevedoring by strengthening environmental pollution prevention facilities and management of scattered dust.

Work Process

1 제품 출하 지원, 2 공장 사내 물류(원재료 가공 및 부재료 운송 외), 3 원재료 하역 및 운송

  • 1Stevedoring and transporting raw materialsUnloading raw materials (Scraps) at the North Port Pier -> transporting raw materials to the rear site and the scrap park
  • 2In-factory logisticsPerforming in-factory logistics and processing of raw materials to be used to produce steel manufacturing.Performing in-factory logistics and processing of raw materials to be used to produce steel manufacturing.
  • 3Supporting product shipmentSupporting shipment of produced bar steel products

Cargos handled

Scrap

Infrastructure

Pier

Pier
  • Total area37,800㎡
  • Berthing Capacity50,000DWTX1
Berth
  • 길이270m,수심11m

Equipment

하버크레인
Harbor Crane
  • Number of equipment2
LLC
LLC
  • Number of equipment1
단굴삭기
three-stage excavator
  • Number of equipment1

Contact

Jaeho, Cho Incheon Stevedoring Team

  • TEL : +82-32-830-6954
  • E-mail : jaeho.cho@dongkuk.com